Braglia Stadium

YEAR

2003

PLACE

Modena

WEIGHT

~ 700 tonn.

-->

Implementation of the renovation of the Braglia Stadium that brought the stadium’s capacity from 16 000 to 21 000 seats. In fact, the elimination of the athletics track gave space to the construction of the new covered bleachers just in front of the playing field.

FeB Studio manufactured the steel part of the new bleachers, the roof and the two connecting curves. The new bleachers are composed of beams electric-welded in variable sections in the shape of a half moon. The beams sit on tubular lattice columns and, at the top, are connected to the roof with steel pins. The roof is also composed of full, electric-welded beams, always in variable sections.