Tempa Rossa

YEAR

2013 - 2016

PLACE

Basilicata

WEIGHT

~ 3000 tonn.

-->

Tempa Rossa is an oil field in the Sauro valley in the heart of the Basilicata region.

The construction of the Tempa Rossa Oil Hub is a grand work composed of numerous support structures for the crude oil, natural gas and sulphur processing and extraction plants.

When fully operational, the plant, among the most advanced in the oil sector, will have a daily production capacity of about 50 000 drums of oil, 230 000 m³ of natural gas, 240 tonnes of GPL and 80 tonnes of sulphur.

Studio FeB created 55 Piperacks for a total of 3 000 tonnes including the main and secondary structures.